Suzuki Grand Vitara SQ416/SQ420/420WD

Since 1998 of release

Repair and car operation



Suzuka Grandee Vitara
+ The general information
+ Maintenance service and greasing
+ Heater, ventilation and the conditioner
+ Steering
+ Suspension bracket
+ Wheels and tyres
+ Forward приводной a shaft shaft/bearing. An oil epiploon
+ Kardannye shaft
+ Brake system
- Engines
   + Mechanical part of engine G16
   + Mechanical part of engine J20
   - Engine cooling
      + The general description
      + Diagnostics
      + Maintenance service
      - Vehicle routine maintenance
         Plums of a cooling liquid
         Hoses or water pipes of system of cooling
         The thermostat
         Belt of the cooling fan
         The cooling fan and муфта the fan
         Radiator
         The water pump
         The gauge of temperature of a cooling liquid of the engine (EATS)
      Necessary service materials
      Technical characteristics of the rotating moment of an inhaling
+ Fuel system
+ Ignition system
+ Start system
+ Release system
+ Transmissions
+ Coupling
+ Transfer
+ Forward and back differentials
+ Windows, mirrors, locks and security measures. An immobilizer
+ Electric equipment







e8f2b5b1

Radiator

Removal

 PERFORMANCE ORDER

  1. Disconnect a negative cable (-) from the accumulator.
  1. Merge cooling system, having turned off a drain stopper (1) radiators.
  1. At service of vehicles А/Т place маслосборник under a radiator (1) and disconnect hoses for liquid А/Т (2), (3) from a radiator.
  1. Turn off nuts of the cooling fan/mufty (1).
  1. Disconnect an inlet hose of a radiator from a radiator.
  1. Remove распорные bolts of the tank of liquid P/S (1) from a radiator rack.
  1. Remove safety clips of a casing of the fan.
  2. Then remove cooling fan/muftu and a radiator casing.
  1. Disconnect a water inlet and final hose (1), (2) and a hose of the tank (3) from a radiator.
  1. Remove a radiator (4).

Check

Check up a radiator about a leaking or damage. Straighten погнутые plates if those are.

Cleaning

Clean a forward part of a core of a radiator.

Installation

Repeat dismantle procedure upside-down, without forgetting as follows.

 PERFORMANCE ORDER

  1. Fill system of cooling with a corresponding cooling liquid, having addressed to Sections the Cooling liquid and Washing and filling of system of cooling in this Chapter.
  2. Adjust a tension of a belt of the cooling fan according to technical requirements. Address to Section Regulation and check of a tension of a belt of the cooling fan in this Chapter.
  3. In vehicles А/Т check up level of liquid А/Т, having addressed to Section liquid Level in the Head the Automatic transmission (4 A/T).
  4. After installation check up each connection, whether there is no leak.